In the print dialog, choose Save as PDF, A4, portrait, 100% scale and default margins. Turn off browser headers and footers. Nothing is uploaded or sent.
Your browser controls the dialog and filename; this button does not automatically download a PDF. If no dialog opens, use your browser’s Print menu in a supported browser. Keep the sample warning visible on every page.
Package scope
Up to three quotations plus consumption context and mandatory human specialist review.
Quote comparison
| Supplier as stated | Total incl. VAT | Evidence gaps |
|---|---|---|
| BlueSky Solar (fictional sample) | R110 423,00 | 1 |
| BrightRoof Energy (fictional sample) | R89 010,00 | 2 |
| ClearCurrent Solar (fictional sample) | R122 015,00 | 1 |
Consumption context — as stated in the sample
Monthly consumption: 680 kWh. Bill range: R2,100–R2,700 (sample statement).
Objectives: Reduce evening grid use; Keep essential circuits available during outages. Supply: single-phase · Gauteng.
No interval load profile, shading survey or site inspection is supplied. Monthly consumption alone does not establish system sizing, backup duration or savings.
Sample findings
Protection-device models
Not supplied or unresolved in BlueSky Solar (fictional sample).
Source: Q-COMP-1Battery throughput warranty
Not supplied or unresolved in BrightRoof Energy (fictional sample).
Source: Q-COMP-2SSEG responsibility
Not supplied or unresolved in BrightRoof Energy (fictional sample).
Source: Q-COMP-2Final distribution-board cost
Not supplied or unresolved in ClearCurrent Solar (fictional sample).
Source: Q-COMP-3Provisional distribution-board work
The stated allowance does not establish a final itemised cost or detailed scope.
Source: Q-COMP-3Source references and quoted scope
BlueSky Solar (fictional sample)
Q-COMP-1 · DOC-COMP-1 · 19 August 2026
Included as stated: Installation labour; Monitoring setup. Excluded as stated: Municipal fees.
Assumptions: Sample property has suitable roof access.
- fixture:quote-1-datasheet · CURRENT in the synthetic fixture · sample-v1 · retrieved 2026-08-30 · South Africa
BrightRoof Energy (fictional sample)
Q-COMP-2 · DOC-COMP-2 · 20 August 2026
Included as stated: Installation labour; Monitoring setup. Excluded as stated: SSEG submission; Scaffolding if required.
Assumptions: Sample property has suitable roof access.
- fixture:quote-2-datasheet · INCOMPLETE in the synthetic fixture · sample-v1 · retrieved 2026-08-30 · South Africa
ClearCurrent Solar (fictional sample)
Q-COMP-3 · DOC-COMP-3 · 21 August 2026
Included as stated: Installation labour; Monitoring setup. Excluded as stated: Municipal fees.
Assumptions: Sample property has suitable roof access.
- fixture:quote-3-datasheet · CURRENT in the synthetic fixture · sample-v1 · retrieved 2026-08-30 · South Africa
These are synthetic source labels, not independently verified or current external approvals. No protected standards are reproduced.
Simulated reviewer decisions
- SIMULATED SPECIALIST REVIEW: consumption context and quoted capacities considered as stated. No system sizing, performance prediction or suitability assessment is made.
- SIMULATED INDEPENDENT REPORT QA: package, arithmetic, source references and limitations checked in this example.
Questions for the installer
- BlueSky Solar (fictional sample): please clarify or provide supporting information for “Protection-device models”.
- BrightRoof Energy (fictional sample): please clarify or provide supporting information for “Battery throughput warranty”.
- BrightRoof Energy (fictional sample): please clarify or provide supporting information for “SSEG responsibility”.
- ClearCurrent Solar (fictional sample): please clarify or provide supporting information for “Final distribution-board cost”.
